Infrastructure Developments
Infrastructure Thrust in 2025-26


Restructured Frontage of the school
School infrastructure received a major boost with the following developments:
- Remodeling of Principal's office
- Renovation of the school frontage
- Installation of a wider main gate
- Restructuring and enhancement of the playground
- Infrastructure improvements included networking upgrades and the installation of CCTV system.
- PLS is a smart, future-ready campus.
Infrastructure Development Thrust– 2024–25
During the academic year 2024–25, our school successfully undertook and completed a range of infrastructure development initiatives aimed at enhancing inclusivity, functionality, and aesthetics across the campus.
- One of the key highlights was the establishment of a dedicated Herbal Garden, now flourishing with a variety of medicinal and aromatic plants. Each plant has been labeled with its botanical and common names, serving both as a green space and a valuable learning resource that promotes environmental awareness and health education among students.
- In line with our vision for a modern and efficient administrative environment, the restructuring of office spaces was completed.
- To ensure a more inclusive and accessible environment for all students, particularly those with special needs, several structural enhancements were successfully implemented. Lifts and ramps were constructed at all main entry points and passageways to ensure smooth, barrier-free movement.
- Furthermore, CWSN-friendly toilets were built and upgraded with features such as grab bars, anti-slip flooring, and child-friendly fixtures.
Infrastructure Thrust 2021-22
- Roof Tress work was done in Primary Block
- Toilet Blocks were constructed in Primary Blocks.
- Beautiful garden was set up in the front area of school.
The Infrastructure Facelift in The Year 2020
Renovations in the building were made with prefabricated façade and roof elements.Two washrooms were built in the primary block. Wonder den was refurbished with new equipments.


Infrastructure Thrust in The Year 2018-19
The management of the school is very keen to provide state of the art infrastructure in tune with the modern day demands
- Two washrooms were built in the primary block.
- Wonder den was refurbished with new equipment.
- New books were purchased for the library.
- Renovations in the building with prefabricated façade and roof elements changed the architecture.
- The front office arena housing the Principal’s office, office room were given a face lift this year